Data checked:

LVM-3 | Chandrayaan-4 First Launch
TBD

LVM-3 | Chandrayaan-4 First Launch

TO BE DETERMINED
> T-MINUS (NET)
--
DAYS
:
--
HRS
:
--
MIN
:
--
SEC
Target time only (NET — no earlier than). This launch is not yet confirmed and may slip.

> MISSION DATA

DATEFriday, December 31, 2027
TIME12:00 AM UTC
PROVIDERIndian Space Research Organization
ROCKETLaunch Vehicle Mark-3 (GSLV Mk III)
PADSatish Dhawan Space Centre Second Launch Pad
LOCATIONSatish Dhawan Space Centre, India
ORBITLunar Orbit

> MISSION BRIEFING // PLANETARY SCIENCE

Chandrayaan-4 is a planned lunar sample-return mission of Indian Space Research Organisation (ISRO) and will be the fourth mission of its Chandrayaan programme. The mission consist of five modules, namely the DM (Descender Module), AM (Ascender Module), TM (Transfer Module), RM (Re-entry Module) and PM (Propulsion Module). The planned mission life is 1 lunar day and the landing site will be near the Lunar South Pole. The first launch will lift the DM (Descender Module) and AM (Ascender Module) to orbit.

> SCHEDULE & SOURCE

Source-reported status: To Be Determined. Current date is a placeholder or rough estimation based on unreliable or interpreted sources.

Launch window: 2027-12-31 00:00:00 UTC — 2027-12-31 00:00:00 UTC.

Dates and windows may change. Passing the scheduled time does not confirm a launch outcome.

Launch data from The Space Devs

Understand launch windows and orbits · Launch provider guide