Data checked:
TBD2nd lunar lander developed by Firefly Aerospace. The Blue Ghost lander will be of a new two-stage version utilizing an Elytra Dark transfer vehicle to place it and the European Space Agency's Lunar Pathfinder experimental communication satellite into Lunar orbit. The lander will land on the far side of the Moon with 2 NASA payloads: * Lunar Surface Electromagnetics Experiment (LuSEE-Night) * User Terminal (UT)
Source-reported status: To Be Determined. Current date is a placeholder or rough estimation based on unreliable or interpreted sources.
Launch window: 2027-12-31 00:00:00 UTC — 2027-12-31 00:00:00 UTC.
Dates and windows may change. Passing the scheduled time does not confirm a launch outcome.
Launch data from The Space Devs
Understand launch windows and orbits · Launch provider guide